Insulated Shipper Instructions
تكييف & Packout Manuals
View translated reference manuals for the insulated box identified as “1#” in the source manuals using refrigerant plates labeled -18°ج, +5°ج, or +15°ج. The PDFs show the documented component set, conditioning paths and illustrated plate placement.
Before You Condition or Pack
Do not begin with a coolant temperature alone. Start with the approved product requirement and reproduce the documented packout inputs.
- Confirm the target: use the product label, مواصفات العميل, خطة سلامة الغذاء, or quality-approved temperature limits and excursion rules.
- Match every component: verify the exact insulated box and the 1-A, 1-ب, and 1-C refrigerant plates shown in the selected PDF.
- Check condition: inspect each component against the approved acceptance criteria; do not use any component that fails them.
- Reproduce conditioning: control the conditioning environment, minimum time, physical state, and surface-temperature acceptance check.
- Prepare the payload: تأكيد الأبعاد, وزن, كمية, initial temperature, الانفصال, and any required barrier from coolant panels.
- Load exactly: follow the illustrated top, قاع, front, rear, and side placement; do not substitute panel quantities or positions.
- Record and monitor: document the manual revision, وقت البدء, conditioning result, إنهاء, logger identity and position, and shipment handover.
- Approve the lane: compare the qualified test profile with the route, بدل تأخير, المواسم الحارة والباردة, وعملية الاستلام.
Manuals by Refrigerant-Plate Label
Choose by the exact shipper and plate configuration, not by label alone. The summaries on this page state what can be confirmed from each public file; use the PDF for its illustrated layout and obtain the current controlled revision before packing a shipment.
1# Insulated Box with -18°C-Labeled Refrigerant Plates
This translated reference shows one 1# box configuration and its plate-placement diagram. It does not state a qualified payload range or transport duration.
ملصق
Reference workflow — verify against current revision
- Confirm the current document and match the box, plate type, quantity and payload specification.
- Condition and temper the plates only to the setpoint, minimum time, physical state and measurement location in the approved revision.
- Place two 1-A plates at the bottom and two at the top; position four 1-B and two 1-C plates as shown in the applicable diagram.
- Close and seal the box, position the monitor as approved, and record the conditioning result and shipment start.
1# Insulated Box with +5°C-Labeled Refrigerant Plates
This translated reference shows two conditioning paths for one 1# box configuration. The correct path depends on the approved payload and shipping profile.
ملصق
Reference workflow — verify against current revision
- Confirm the current document and the approved conditioning path for the payload, route and ambient profile.
- Match the box and plate set, then condition and temper the plates to the approved state and measured acceptance range.
- Reproduce the applicable diagram using four 1-A, four 1-B and two 1-C plates; do not combine the two paths.
- Close and seal the box, position the monitor as approved, and record the path, conditioning result and shipment start.
1# Insulated Box with +15°C-Labeled Refrigerant Plates
This translated reference shows two conditioning paths for one 1# box configuration. It does not establish a general 15 to 25°C performance claim.
ملصق
Reference workflow — verify against current revision
- Confirm the current document and the approved conditioning path for the payload, route and ambient profile.
- Match the box and plate set, then condition and temper the plates to the approved state and measured acceptance range.
- Reproduce the applicable diagram using four 1-A, four 1-B and two 1-C plates; do not combine the two paths.
- Close and seal the box, position the monitor as approved, and record the path, conditioning result and shipment start.
Document Control and Qualification
Confirm the current revision
قبل الموافقة, request the current manual, engineering drawing, refrigerant-plate specification, plate dimensions, مخطط الحزمة, and available test report for the quoted SKU.
Qualify the actual packout
Evaluate representative minimum and maximum payloads, تكييف, مواقف المسجل, ملامح المحيطة الساخنة والباردة, وقت الطريق, التأخير, التعامل مع, ومعايير القبول.
Control operational changes
Review changes to the box, panels, مزود, حمولة, كمية, موضع, conditioning equipment, طريق, موسم, إنهاء, or monitoring plan before reuse.
Related temperature pages
These pages describe available temperature-control options; they do not prove that any manual above applies to a particular payload, box or qualified temperature range.
WHO technical guidance treats conditioning, تحميل, التعامل مع, يراقب, and qualification as parts of a defined transport process. انظر مكتبة إرشادات التوزيع الخاصة بمنظمة الصحة العالمية و WHO passive-container and coolant-pack handbook. تسمية المنتج, customer quality system, اللوائح المعمول بها, and approved qualification remain controlling.
Need the Current Manual or a Packout Review?
Share the box and refrigerant-plate model, payload temperature limits, payload mass and dimensions, مدة الطريق, الملف المحيطي الموسمي, current document revision, and monitoring requirements. Huizhou can identify the relevant file or flag where a configuration review is required.